• About
    • Info & Team
    • Support
    • Storefront
  • Work
    • Undergraduate Work
    • Graduate Work
    • Alumni Work
    • Faculty Work
    • Co-op
  • Community
    • Exhibition
    • Event
    • Initiatives
  • Articles
bridge@waterlooarchitecture.com
BridgeBridge
  • About
    • Info & Team
    • Support
    • Storefront
  • Work
    • Undergraduate Work
    • Graduate Work
    • Alumni Work
    • Faculty Work
    • Co-op
  • Community
    • Exhibition
    • Event
    • Initiatives
  • Articles

THESIS: Kyle Elderhorst – REvision 2020: Redefining Public Works in New York City’s Sixth Borough

February 10, 2013 Posted by Andrea Hunniford Graduate Work, Work

Day Render

On March 14, 2011 the Bloomberg Administration unveiled New York City’s 10-year comprehensive waterfront plan entitled, “Vision 2020.” Though the document follows a long line of waterfront revitalization proposals, it offers an extraordinarily profound and historically unprecedented ambition to re-establish New York as one of the world’s premiere waterfront cities by transforming its post-industrial harbour into a “Sixth Borough” capable of sustaining expanded urban development, recreation, local ecologies, and water-based economies. Underlying this extensive redevelopment scheme is a massive environmental remediation initiative that aims to improve water quality throughout the region by upgrading the city’s crumbling, century-old sewer system to prevent it from spilling millions of gallons of untreated effluent into the New York Harbor every week. With no federal funding available for these costly upgrades, the city will depend on its taxpayers to finance the new borough’s extensive list of infrastructural needs. Convincing the public to support this initiative will however prove to be immensely difficult as most New Yorkers are unaware of the critical need for infrastructure at the waterfront and would rather see their taxes spent on parks, amenities, transportation, housing or the creation of jobs. Despite this, “Vision 2020” proposes the construction of standardized, single-service, shovel-ready, infrastructure that will be buried underground where it will make no visible social, aesthetic, or economic contribution to the transformation of public waterfront. For these reasons, REvision 2020 is proposed.

Rather than subscribing to the 20th century understanding of infrastructure as a service-based utility, REvision 2020 examines the potential for the renovation New York City’s sewer system to catalyze a much larger and more visible public benefit in the Sixth Borough. In doing so, the document investigates the complex social, political, economic, and environmental challenges underlying the revitalization of the post-industrial waterfront and presents strategies for addressing these matters through a renegotiation of conventional infrastructural form. These strategies are then synthesized and applied to the design of a buoyant, high-performance sanitation system deployed in Brooklyn’s notoriously toxic Gowanus Canal to transform the derelict shipping channel into a public Wastewater-To-Resource Park that converts the region’s excess sewage into fresh water, nutrients, and energy which are reused to sustain recreational activities and new water-based economies. In addition to proposing a bottom-lined approach to the development of the Sixth Borough, REvision 2020 and the Gowanus W.T.R. Park champion the exploration of infrastructure not only as an engineering endeavor, but as a robust design opportunity.

The examining committee is as follows:

Supervisor:

Lola Sheppard

Committee Members:

John McMinn, University of Waterloo

Maya Przbylski, University of Waterloo

External Reader:

Marc Ryan

The Defence Examination will take place: Monday February 11, 2013 1:30 PM ARC 2026

73small copy

53 small

78 small

87 small

processdiagram small

rendernight

Andrea Hunniford
+ postsBio
  • Andrea Hunniford
    https://waterlooarchitecture.com/bridge/blog/author/ahunniford/
    Shelf Space + Reading Room: A Spatial History of the New York Public Library
  • Andrea Hunniford
    https://waterlooarchitecture.com/bridge/blog/author/ahunniford/
    MASTERS OPEN STUDIO NIGHT 2013
  • Andrea Hunniford
    https://waterlooarchitecture.com/bridge/blog/author/ahunniford/
    Tips From an Elder: Pre-Press Checklist
  • Andrea Hunniford
    https://waterlooarchitecture.com/bridge/blog/author/ahunniford/
    ACADIA 2013: SCHEDULE
Tags: Kyle Elderhorstthesis

About Andrea Hunniford

This author hasn't written their bio yet.
Andrea Hunniford has contributed 25 entries to our website, so far.View entries by Andrea Hunniford

You also might be interested in

THESIS: Tales of a Flood

THESIS: Tales of a Flood

Dec 2, 2014

Alireza Takook will defend his thesis, the narrative of a destructive natural phenomenon depicting an architect's evolving understanding of the natural world, on December 10 at 10 am in the Architecture Loft.

THESIS: Jonathan Lim – AERO|ASTRO Architecture: the hybridizing frontier of emergent industries

THESIS: Jonathan Lim – AERO|ASTRO Architecture: the hybridizing frontier of emergent industries

Jan 20, 2013

Architectural designers often need to strike an uneasy balance between[...]

Thesis Peer Review

Thesis Peer Review

Oct 15, 2014

Peer Review is an intellectual event for graduate students to present their thesis work to their peers for helpful feedback. The event will be held on Thursday October 23rd at 8pm at the BRIDGE Pop-Up.

Leave a Reply Cancel Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Search

BRIDGE

Center for Architecture + Design

7 Melville St. S, Cambridge, ON

  • bridge@waterlooarchitecture.com

© 2025 — BRIDGE.