• About
    • Info & Team
    • Support
    • Storefront
  • Work
    • Undergraduate Work
    • Graduate Work
    • Alumni Work
    • Faculty Work
    • Co-op
  • Articles
  • Community
    • Exhibition
    • Event
    • Initiatives
bridge@waterlooarchitecture.com
BridgeBridge
  • About
    • Info & Team
    • Support
    • Storefront
  • Work
    • Undergraduate Work
    • Graduate Work
    • Alumni Work
    • Faculty Work
    • Co-op
  • Articles
  • Community
    • Exhibition
    • Event
    • Initiatives

BRIDGE Storefront Status

September 26, 2013 Posted by Nikola Miloradovic Uncategorized

BRIDGE Storefront is making headway!

Last Friday’s meeting attracted a group of eager students looking to help out with the initiative. BRIDGE now has more students posting right here on the website, and is gathering a student renovations team ready to help out with whatever they can. Currently the space is encased by a basic lightweight steel stud skeleton. The fire alarm and electrical are partially installed, we are still waiting for the plumbing installation to take place. We’re trying to get more light fixtures in the space as the double-height back area will need the extra lighting.

The gallery extends from Main Street back to the parking lot where our beloved Walshee’s is located. The back double-height area will have room for larger student pieces and possibly installations as well.

If you want to get involved with the space, or if you have ideas of what the space could look like after renovations, email: bridge@waterlooarchitecture.com

We would love to see design concepts, lighting arrangements, signage proposals any ideas! Come out this Thursday October 3rd at 1:00 in the F_RMlab office to discuss the gallery and the website.

 

(photos taken Sept. 22, 2013)

Current state of gallery - view from entrance

Current state of gallery – view from entrance

Exposed back wall of the double-height space

Exposed back wall

View from double-height space looking towards entrance

View from the double-height space looking towards the entrance

 

Metal studs and entrance

Metal studs and entrance

Nikola Miloradovic
+ postsBio
  • Nikola Miloradovic
    http://waterlooarchitecture.com/bridge/blog/author/nmilorad/
    Co-op City Guide: Amsterdam, The Netherlands

About Nikola Miloradovic

This author hasn't written their bio yet.
Nikola Miloradovic has contributed 2 entries to our website, so far.View entries by Nikola Miloradovic

You also might be interested in

History Here is The Story of Somewhere Else

History Here is The Story of Somewhere Else

Jan 16, 2017

North America has a Substituted History: we live on a continent where one set of histories and heritage was forcibly substituted for another. The main narrative that drives our culture-making is an import from somewhere else.

Bridge Meeting Minutes

Bridge Meeting Minutes

Dec 9, 2013

Bridge Meeting Minutes for Tuesday, November 19th, 2013 Ward Room[...]

Photography Exhibition: Meet the Photographers

Photography Exhibition: Meet the Photographers

Mar 19, 2018

BRIDGE will be hosting a photography exhibition at the Storefront on[...]

Search

BRIDGE

Center for Architecture + Design

7 Melville St. S, Cambridge, ON

  • bridge@waterlooarchitecture.com

© 2025 — BRIDGE.