• About
    • Info
    • Support
    • Storefront
  • Work
    • Undergraduate Work
    • Graduate Work
    • Alumni Work
    • Faculty Work
    • Co-op
  • Articles
    • Resource
    • Opinion
    • Treaty Lands | Global Stories
  • Community
    • Event
    • Initiatives
[email protected]
Bridge Bridge
  • About
    • Info
    • Support
    • Storefront
  • Work
    • Undergraduate Work
    • Graduate Work
    • Alumni Work
    • Faculty Work
    • Co-op
  • Articles
    • Resource
    • Opinion
    • Treaty Lands | Global Stories
  • Community
    • Event
    • Initiatives

THESIS: Kyle Elderhorst - REvision 2020: Redefining Public Works in New York City’s Sixth Borough

Feb 10, 2013 | Posted by Andrea Hunniford | Graduate Work, Work |

On March 14, 2011 the Bloomberg Administration unveiled New York City’s 10-year comprehensive waterfront plan entitled, “Vision 2020.” Though the document follows a long line of waterfront revitalization proposals, it offers an extraordinarily profound and historically unprecedented ambition to re-establish New York as one of the world’s premiere waterfront cities by transforming its post-industrial harbour into a “Sixth Borough” capable of sustaining expanded urban development, recreation, local ecologies, and water-based economies. Underlying this extensive redevelopment scheme is a massive environmental remediation initiative that aims to improve water quality throughout the region by upgrading the city’s crumbling, century-old sewer system to prevent it from spilling millions of gallons of untreated effluent into the New York Harbor every week. With no federal funding available for these costly upgrades, the city will depend on its taxpayers to finance the new borough’s extensive list of infrastructural needs. Convincing the public to support this initiative will however prove to be immensely difficult as most New Yorkers are unaware of the critical need for infrastructure at the waterfront and would rather see their taxes spent on parks, amenities, transportation, housing or the creation of jobs. Despite this, “Vision 2020” proposes the construction of standardized, single-service, shovel-ready, infrastructure that will be buried underground where it will make no visible social, aesthetic, or economic contribution to the transformation of public waterfront. For these reasons, REvision 2020 is proposed.

Rather than subscribing to the 20th century understanding of infrastructure as a service-based utility, REvision 2020 examines the potential for the renovation New York City’s sewer system to catalyze a much larger and more visible public benefit in the Sixth Borough. In doing so, the document investigates the complex social, political, economic, and environmental challenges underlying the revitalization of the post-industrial waterfront and presents strategies for addressing these matters through a renegotiation of conventional infrastructural form. These strategies are then synthesized and applied to the design of a buoyant, high-performance sanitation system deployed in Brooklyn’s notoriously toxic Gowanus Canal to transform the derelict shipping channel into a public Wastewater-To-Resource Park that converts the region’s excess sewage into fresh water, nutrients, and energy which are reused to sustain recreational activities and new water-based economies. In addition to proposing a bottom-lined approach to the development of the Sixth Borough, REvision 2020 and the Gowanus W.T.R. Park champion the exploration of infrastructure not only as an engineering endeavor, but as a robust design opportunity.

The examining committee is as follows:

Supervisor:

Lola Sheppard

Committee Members:

John McMinn, University of Waterloo

Maya Przbylski, University of Waterloo

External Reader:

Marc Ryan

The Defence Examination will take place: Monday February 11, 2013 1:30 PM ARC 2026

Tags: Kyle Elderhorstthesis

About Andrea Hunniford

This author hasn't written their bio yet.
Andrea Hunniford has contributed 25 entries to our website, so far. View entries by Andrea Hunniford.

You also might be interested in

THESIS: Jessica Craig - Dreams of Slaughter

Apr 17, 2013

A descent into the ravine is to step through a[...]

THESIS: Building Fiction: The Architecture of Narrative in Harry Potter

Mar 25, 2015

Holland Young's thesis entitled "Building Fiction: The Architecture of Narrative in Harry Potter" explores how storytellers use overlapping real and fictional architectural environments in order to propel narrative and precipitate an immersive experience for an audience. Her defence will take place on Friday March 27, 2015 10:00 AM in the Main Lecture Theatre.

The Mountain and the Valley

Aug 7, 2014

ABSTRACT by Caitlin Perry The Annapolis Valley Region is home[...]

Leave a Reply Cancel Reply

Search

Top Posts This Month

  1. Beggs - Chemo Suite Before and AfterTHESIS: Healing through Architecture – Bridge
  2. THESIS: The River is for Washing Carpets – Bridge
  3. The generalized typologies of sites that van Eyck would use to create his playgrounds: (from left) Boulevard, Courtyard, Plaza, and ParkCase Study: van Eyck’s Playgrounds – Bridge
  4. BRIDGE_ICON_InDESIGN_squareOn Laying Out your Thesis in InDesign – Bridge
  5. Lateral Office: Arctic Food Network – Bridge

© 2017 — BRIDGE.